Houston — Asset management firm Capital Dynamics and independent power producer Tenaska said Wednesday they are forming a “new strategic relationship” to build 24 solar facilities with 4.8 GW of capacity in the Midcontinent Independent System Operator and SERC Reliability…
Author: Rick Ankrum
MISO has 5.9 GW of generation capacity being built with 2020 in-service dates
Houston — Almost 5.9 GW of generation is under construction in the Midcontinent Independent System Operator footprint with negotiated in-service dates before the end of 2020, a report generated July 6 shows, and that excludes 489 MW of gas-fired generation that…