Background:
The purpose of this filing is to shift the location of the Renewable Energy Credit (REC) meter at the Desert
Sky Wind Farm from the ERCOT-Polled settlement meter, ERCOT-Polled Settlement (EPS) Meter, to a
self-reported meter at the generator interconnection facility. A load is being interconnected at the 34.5 kV
substation behind the EPS Meter at the Desert Sky Wind Farm. With the addition of this new load, the EPS
Meter for REC reporting will no longer represent the energy generated by the Desert Sky Wind Farm. A
filing to shift the REC metering location is necessary for the facility to continue to receive the appropriate
RECs for the renewable energy generated. …